WE-OMC/238/DV: To approve draft OD 551-16 Assessment of RETLs for the measurement of electrical characteristics of electricity producing wind turbines (Closes 14-Oct)

starts on 30 September, 2017 ends on 14 October, 2017



Should the US vote to approve draft OD 551-16 Assessment of RETLs for the measurement of electrical characteristics of electricity producing wind turbines?
You need to log-in if you want to continue with the voting process
Description

BACKGROUND:
SG551 drafted OD 551-16, which was submitted as WE-OMC/219/DC to the WE-OMC Member Bodies, WG 501 and SGs for comments by 2017-09-17. No comments were received.
Therefore, as requested by the WE-OMC Chair and the SG 551 Convener, Draft OD 551-16 is being submitted for approval to the membership.
Since IEC CA 01 and IECRE 01-S have replaced IECRE 01, the following applies:

IEC CA 01 clause 12.2
Voting by correspondence utilizes the following process:
a) documents requiring vote are circulated to the Member Bodies by the Secretariat with the approval of the Chair;
b) Member Bodies are provided 45 days (12 weeks for amendments to the Basic Rules and Rules of Procedure, see 12.4) for electronic open comment and dialogue along with Member Body vote
c) if substantive comments are received, Member Bodies are provided 30 additional days for review of comments, dialogue and submission of Member Body final vote.

ACTION:
The WE-OMC Member Bodies to approve draft OD-551-16 ed.1.0, effective immediately. Ballots are to be returned to the IECRE Secretariat (secretariat@iecre.org) no later than 2017-11-05.

NOTE: USNC/IECRE ballots to be submitted within two weeks to allow for resolution of any comments prior to the IEC deadline.

ARESCA © 2020 All rights reserved