WE-OMC/202/DV To ratify Moeller Operating Engineering GmbH as an RETL for Power Curve measurements & Loads testing (Closes 18-Sep)

starts on 11 August, 2017 ends on 18 September, 2017



Should the US vote to ratify Moeller Operating Engineering GmbH as an RETL for Power Performance & Loads testing within the IECRE System?
You need to log-in if you want to continue with the voting process
Description

BACKGROUND:

In accordance with IECRE OD-500:2016, the Executive Secretary of the IECRE recommends ratification, by the WE-OMC Member Bodies, of:

• Moeller Operating Engineering GmbH

as an RETL within the IECRE System for its identified scope.

See the testing laboratory summary assessment report summary distributed separately as
WE-OMC/203/IAR.

If ratified by the WE-OMC, and as per the rules, the REMC will be subsequently requested to ratify the decision. It should be noted that, upon acceptance by the WE-OMC, the candidate RETL may begin operating as an accepted IECRE testing laboratory (RETL), up to and including the issuance of IECRE Test Reports.

ACTION:
WE-OMC Member Bodies to ratify Moeller Operating Engineering GmbH as an RETL within the IECRE System, for its identified scope.

WE-OMC Member Bodies are requested to vote on the ratification no later than
2017-09-25.

NOTE: USNC/IECRE ballots to be submitted one week prior to the IEC deadline.