WE-OMC/188/DV: To approve OD501-1 Conformity assessment and certification of Blade by RECB (Closes 31-July)

starts on 27 June, 2017 ends on 31 July, 2017



Should the US vote to approve Draft OD-501-1 ed.1.0 Conformity assessment and certification of Blade by RECB?

You need to log-in if you want to continue with the voting process
Description

Background:

As noted at the last WE-OMC meeting in Golden (see WE-OMC/167/RM item 8.3), SG550 reviewed comments received as per WE-OMC/164/CC, their response to the comments received can be found in WE-OMC/164A/CC. Based on the comments received, SG 550 has revised draft OD-501-1 (see track changes) and is seeking Member Body approval.

Since IEC CA 01 and IECRE 01-S have replaced IECRE 01, the following applies:

IEC CA 01 clause 12.2
Voting by correspondence utilizes the following process:
a) documents requiring vote are circulated to the Member Bodies by the Secretariat with the approval of the Chair;
b) Member Bodies are provided 45 days (12 weeks for amendments to the Basic Rules and Rules of Procedure, see 12.4) for electronic open comment and dialogue along with Member Body vote
c) if substantive comments are received, Member Bodies are provided 30 additional days for review of comments, dialogue and submission of Member Body final vote.

Action:

The WE-OMC Member Bodies to approve draft OD-501-1 ed.1.0, effective immediately. Ballots are to be returned to the IECRE Secretariat ([email protected]) no later than 2017-08-07.

NOTE: USNC/IECRE ballots to be submitted one week prior to the IEC deadline.

ARESCA © 2024 All rights reserved