WE-OMC/179/DV: To approve Windtest Grevenbroich Gmbh as an RETL for Power Curve measurements & Loads testing (Closes 1-Jul)

starts on 15 June, 2017 ends on 01 July, 2017



Should the US vote to approve Windtest Grevenbroich Gmbh as an RETL for Power Curve measurements & Loads testing within the IECRE system?

You need to log-in if you want to continue with the voting process
Description

BACKGROUND:

In accordance with IECRE OD-500:2016, the Executive Secretary of the IECRE recommends ratification, by the WE-OMC Member Bodies, of:

• Windtest Grevenbroich Gmbh

as an RETL within the IECRE System for its identified scope.

See the testing laboratory summary assessment report summary distributed separately as
WE-OMC/180/IAR.

If ratified by the WE-OMC, and as per the rules, the REMC will be requested to ratify the decision. It should be noted that, upon acceptance by the WE-OMC, the candidate RETL may begin operating as an accepted IECRE testing laboratory (RETL), up to and including the issuance of IECRE Test Reports.

ACTION:
WE-OMC Member Bodies to ratify Windtest Grevenbroich Gmbh as an RETL within the IECRE System, for its identified scope.
WE-OMC Member Bodies are requested to vote on the ratification no later than
2017-07-08.

NOTICE: USNC/IECRE ballots must be submitted no later than 2017-07-01.

ARESCA © 2024 All rights reserved