WE-OMC/113/DV: To approve Sgurr Energy as RETL for Power Performance

starts on 04 January, 2017 ends on 18 January, 2017



Should the US vote to approve SgurrEnergy Ltd. as an RETL within the IECRE System, for its identified scope (power performance), based on the Initial Assessment Report WE-OMC/114/IAR?

You need to log-in if you want to continue with the voting process
Description

In accordance with IECRE OD-500:2016, the Executive Secretary of the IECRE recommends approval, by the WE-OMC Member Bodies, of:

• SgurrEnergy Ltd.

as an RETL within the IECRE System for its identified scope.

See the test laboratory assessment report summary distributed separately as
WE-OMC/114/IAR.

If approved by the WE-OMC, and as per the rules, the REMC will be requested to ratify the decision. It should be noted that, upon acceptance by the WE-OMC, the candidate RETL may begin operating as an accepted IECRE test laboratory (RETL), up to and including the issuance of IECRE Test Reports.

WE-OMC Member Bodies are asked to approve SgurrEnergy Ltd. as an RETL within the IECRE System, for its identified scope, no later than 2017-01-22.