WE-OMC/103/DV: To approve CEPRI as RETL for Power Performance and Loads Measurement

starts on 23 January, 2017 ends on 18 February, 2017



Should the US vote to approve China Electric Power Research Institute (CEPRI) as RETL for Power Performance and Loads testing within the IECRE System?

You need to log-in if you want to continue with the voting process
Description

we-omc104iarBACKGROUND:

In accordance with IECRE OD-500:2016, the Executive Secretary of the IECRE recommends approval, by the WE-OMC Member Bodies, of:

• China Electric Power Research Institute (CEPRI)

as an RETL within the IECRE System for its identified scope.

See the test laboratory assessment report summary distributed separately as
WE-OMC/104/IAR.

If approved by the WE-OMC, and as per the rules, the REMC will be requested to ratify the decision. It should be noted that, upon acceptance by the WE-OMC, the candidate RETL may begin operating as an accepted IECRE test laboratory (RETL), up to and including the issuance of IECRE Test Reports.

ACTION:
WE-OMC Member Bodies to approve China Electric Power Research Institute (CEPRI) as an RETL within the IECRE System, for its identified scope.
WE-OMC Member Bodies are requested to vote on the approval no later than 2017-02-22.

ARESCA © 2024 All rights reserved