– WE-OMC/350/DV: To approve the list of standards for use in the WE-OMC (Closes 4-Feb)

starts on 21 January, 2019 ends on 04 February, 2019



Should the US vote to approve the list of standards for use in the WE-OMC?

You need to log-in if you want to continue with the voting process
Description

BACKGROUND:
During the 2018-11-14/15 meeting in Sanya, China, the WE-OMC tasked the Chair with the development of a list of standards for use in the WE-OMC. Below you will find the list of standards provided by the WE-OMC Chair for WE-OMC approval:

IEC 61400-1:2005
Editin 3.0
IEC 61400-1:2005+AMD1:2010 CSV
Edition 3.1
IEC 61400-1:2005+AMD1:2010 CSV/COR1:2016
Wind turbines – Part 1: Design requirements

IEC 61400-2:2013
Edition 3.0 (2013-12-12)
Wind turbines – Part 2: Small wind turbines

IEC 61400-3:2009
Edition 1.0 (2009-02-11)
Wind turbines – Part 3: Design requirements for offshore wind turbines

IEC 61400-4:2012
Edition 1.0 (2012-12-04)
Wind turbines – Part 4: Design requirements for wind turbine gearboxes

IEC 61400-11:2012
Edition 3.0 (2012-11-07)
IEC 61400-11:2012+AMD1:2018 CSV
Edition 3.1 (2018-06-15)
Wind turbines – Part 11: Acoustic noise measurement techniques

IEC 61400-12-1:2017
Edition 2.0 (2017-03-03)
Wind energy generation systems – Part 12-1: Power performance measurements of electricity producing wind turbines

IEC 61400-13:2015
Edition 1.0 (2015-12-21)
Wind turbines – Part 13: Measurement of mechanical loads

IEC 61400-21:2008
Edition 2.0 (2008-08-13)
Wind turbines – Part 21: Measurement and assessment of power quality characteristics of grid connected wind turbines

IEC 61400-23:2014 Edition 1.0 (2014-04-08)
Wind turbines – Part 23: Full-scale structural testing of rotor blades

Once approved by the WE-OMC, this listing will be submitted to the REMC for approval and subsequent listing in the relevant area of the website (http://www.iecre.org/certification/iecstandards/)

ACTION:
WE-OMC Member Bodies to approve the list of standards for use in the WE-OMC. WE-OMC Member Bodies are requested to vote on the approval no later than 2019-02-25.

NOTE: USNC/IECRE ballots are to be submitted within two weeks to allow for resolution of any comments prior to the IEC deadline.

ARESCA © 2024 All rights reserved