starts on 08 October, 2018 ends on 22 October, 2018
Should the US vote to approve OD-551-15 Ed.1.0 OD Wind turbines – Acoustic noise measurement techniques?
BACKGROUND:
As per WE-OMC/218/DC sent out on 2017-08-18, WE-OMC MBs, WG 501 and the SGs were requested to provide their comments no later than 2017-09-17. Comments were received and WE-OMC/234/CC was published on 2017-09-18.
Comments received were reviewed by SG 551 and their response to the comments are included in WE-OMC/234A/CC, which is being published as a separate document at the same time as this voting document. OD-551-15 Ed.1.0 includes the updated text based on the comments received and is being submitted for approval to the membership.
ACTION:
The WE-OMC Member Bodies to approve draft OD 551-15 Ed.1.0, effective immediately. Ballots are to be returned to the IECRE Secretariat ([email protected]) no later than 2018-10-31.
NOTE: USNC/IECRE ballots to be submitted within two weeks to allow for resolution of any comments prior to the IEC deadline.