Should the US vote to ratify the WE-OMC approval of Windtest Grevenbroich Gmbh as an RETL for Power Curve measurements & Loads testing within the IECRE System (WE-OMC/179/DV)?
You need to log-in if you want to continue with the voting process
Description

BACKGROUND:
On 2017-06-09 WE-OMC/179/DV was sent to WE-OMC Member Bodies who were requested to provide approval of Windtest Grevenbroich Gmbh as an RETL. The results of voting (WE-OMC/201/RV) were published on 2017-07-10. The majority of WE-OMC Member Bodies voted in favour of Windtest Grevenbroich Gmbh to operate as RETL for Power Curve measurements and Loads testing.

Therefore, in accordance with the approved WE-OMC transition plan, this is now being submitted for ratification to the REMC.

ACTION:
The REMC Member Bodies to ratify Windtest Grevenbroich Gmbh for RETL status, effective immediately. Ballots are to be returned to the IECRE Secretariat (secretariat@iecre.org) no later than 2017-08-24.