starts on 23 May, 2017 ends on 24 June, 2017
Should the US vote to ratify the WE-OMC approval (WE-OMC/162/DV) of WIND-consult Ingenieurgesellschaft für umweltschonende Energiewandlung mbH as an RETL for Power Curve measurements, Anemometer calibration & Loads testing?
BACKGROUND:
On 2017-03-28 WE-OMC/162/DV was sent to WE-OMC Member Bodies who were requested to provide approval of WIND-consult Ingenieurgesellschaft für umweltschonende Energiewandlung mbH as an RETL. The results of voting
(WE-OMC/178/RV) were published on 2017-05-01. The majority of WE-OMC Member Bodies voted in favour of WIND-consult Ingenieurgesellschaft für umweltschonende Energiewandlung mbH to operate as RETL for Power Curve measurements, Anemometer calibration & Loads testing.
Therefore, in accordance with the approved WE-OMC transition plan, this is now being submitted for ratification to the REMC.
ACTION:
The REMC Member Bodies to ratify WIND-consult Ingenieurgesellschaft für umweltschonende Energiewandlung mbH for RETL status, effective immediately. Ballots are to be returned to the IECRE Secretariat ([email protected]) no later than 2017-07-01.
NOTE: USNC/IECRE ballots to be submitted one week prior to the IEC deadline.