REMC/443/DV – Document for vote: To approve Draft OD-410-1 Ed.2.0 – IECRE Quality System Requirements for PV Plant Installation and Maintenance – Part 1: Requirements for certification (Closes 3-Jun)

starts on 04 May, 2020 ends on 03 June, 2020



Should the US vote to approve Draft OD-410-1 Ed.2.0?
You need to log-in if you want to continue with the voting process
Description

Background:

 

As a follow-up to PV-OMC Decision 01/2019, WG 409 has drafted OD-405-1 ed.3, IECRE Quality System Requirements for Manufacturers – Part 1: Requirements for certification of a quality system for PV module manufacturing, which the IECRE Chair has approved to submit to the IECRE Member Bodies for comments.

 

PV-OMC Decision 01/2019: The PV-OMC preferred option 2 of PV-OMC/188/DFA, PV-activity to remain in IECRE, however, requesting IECRE to restructure the entire system to become effective. The PV-OMC identified areas to be improved with in the PV-OMC area and will assign tasks to the relevant WGs during review of the WG activity reports under other agenda items.

 

Secretariat note: this document is a consolidation of OD-410-1 ed.1.0 and OD-410-3 ed.1.0 into OD-410-1 ed.2.0 according to the decision made in the Gaithersburg meeting, therefore, upon acceptance of this OD, OD-410-3 will be withdrawn.

Action:

 

The REMC Member Bodies to approve Draft OD-410-1 Ed.2.0 IECRE Quality System Requirements for PV Plant Installation and Maintenance – Part 1: Requirements for certification. Ballots are to be returned to the IECRE Secretariat (secretariat@iecre.org) no later than 2020-06-14.

NOTE: USNC/IECRE ballots are to be submitted within thirty days to allow for resolution of any comments prior to the IEC deadline.

ARESCA © 2020 All rights reserved