REMC/385/DV: Ratification of Moeller Operating Engineering GmbH (M.O.E.) for its RETL scope extension to include Acoustic testing (Closes 28-Sep)

starts on 29 August, 2019 ends on 28 September, 2019



Should the US ratify the WE-OMC approval of Moeller Operating Engineering GmbH (M.O.E.) for its RETL scope extension to include Acoustic testing within the IECRE System?

You need to log-in if you want to continue with the voting process
Description

BACKGROUND:
On 2019-07-02 WE-OMC/435/DV was sent to WE-OMC Member Bodies who were requested to approve the scope extension of Moeller Operating Engineering GmbH (M.O.E.) as an RETL for Acoustic testing.

The results of voting (WE-OMC/456/RV) were published on 2019-08-19. Out of the 11
WE-OMC voting Member Bodies, 10 voted in favour of Moeller Operating Engineering GmbH (M.O.E.) to extend its RETL scope to include Acoustic testing.

Therefore, in accordance with the approved IECRE Rules, this is now being submitted for ratification to the REMC.

ACTION:
The REMC Member Bodies to ratify Moeller Operating Engineering GmbH (M.O.E.) for its RETL scope extension to include Acoustic testing, effective immediately. Ballots are to be returned to the IECRE Secretariat ([email protected]) no later than 2019-10-11.

NOTE: USNC/IECRE ballots are to be submitted within thirty days to allow for resolution of any comments prior to the IEC deadline.

ARESCA © 2024 All rights reserved