REMC/285/DV: Ratification of LM Wind Power A/S as an RETL for Blade testing within the IECRE System (Closes 26-Sep)

starts on 12 September, 2018 ends on 26 September, 2018



Should the US vote to ratify the WE-OMC approval of LM Wind Power A/S as an RETL for Blade testing within the IECRE System (WE-OMC/311/DV)?

You need to log-in if you want to continue with the voting process
Description

BACKGROUND:
On 2018-07-17 WE-OMC/311/DV was sent to WE-OMC Member Bodies who were requested to provide approval of LM Wind Power A/S as an RETL. The results of voting (WE-OMC/332/RV) were published on 2018-09-03. All of the WE-OMC Member Bodies voted in favour of LM Wind Power A/S to operate as RETL for Blade testing.

Therefore, in accordance with the approved WE-OMC transition plan, this is now being submitted for ratification to the REMC.

ACTION:
The REMC Member Bodies to ratify LM Wind Power A/S for RETL status, effective immediately. Ballots are to be returned to the IECRE Secretariat ([email protected]) no later than 2018-10-17.

NOTE: USNC/IECRE ballots to be submitted within two weeks to allow for resolution of any comments prior to the IEC deadline.

ARESCA © 2024 All rights reserved