PV-OMC/103/DV: Approval of the Draft IECRE 04 Edition 2.0 and the PV-OMC scope standard listing (Closes 16-Oct)

starts on 07 August, 2017 ends on 16 October, 2017



Should the US vote to approve the Draft IECRE 04 Edition 2.0 and the PV-OMC scope standard listing developed at the Budapest meeting?
You need to log-in if you want to continue with the voting process
Description

BACKGROUND:

As per the below decision taken at the 2017-06-21 Budapest meeting, the PV-OMC is requested to approve Draft IECRE 04 Edition 2.0, as well as the PV-OMC scope standard listing, which will, once approved, appear in the IECRE website.

PV-OMC Scope standard listing

Standards Description Applicable to RECB/REIB
IEC 62548:2016 Photovoltaic (PV) arrays – Design requirements RECB
IEC 62738 to be published Design guidelines and recommendations for photovoltaic power plants RECB
IEC 62446-1:2016 Grid connected photovoltaic systems – Minimum requirements for system documentation, commissioning tests and inspection REIB
IEC 62446-2 to be published Grid connected photovoltaic systems – Maintenance of PV systems REIB
IEC 62446-3:2017 Photovoltaic (PV) systems – Requirements for testing, documentation and maintenance – Part 3: Photovoltaic modules and plants – Outdoor infrared thermography REIB
IEC 61724-1:2017 Photovoltaic system performance – Part 1: Monitoring REIB
IEC TS 61724-2:2016 Photovoltaic system performance – Part 2: Capacity evaluation method RECB
IEC TS 61724-3:2016 Photovoltaic system performance – Part 3: Energy evaluation method RECB
IEC TS 62941:2016 Guideline for increased confidence in PV module design qualification and type approval RECB
IEC 62817:2014 Photovoltaic systems – Design qualification of solar trackers RECB
IEC TS 63049 to be published Terrestrial photovoltaic ( PV) systems – Guideline for increased confidence in PV system installation. RECB

Extracted from PV-OMC/090/RM:

Decision 04/2017: The PV-OMC assigned WG 401 to review the standard series from Annex A of IECRE 04 Edition 1, and to make a proposal to the PV-OMC regarding which Parts, Editions and Amendments are to be included in the PV scope in the IECRE website. Once input is received from WG 401, the Secretariat will revise Annex A of IECRE 04 by making reference to the scope that is identified on the website under: http://www.iecre.org/certification/iecstandards/ and, thereby removing the table of standards from Annex A. The Secretariat will submit both the detailed standards listing and IECRE 04 Edition 2 to the PV-OMC for approval. Subsequently, IECRE 04 Edition 2 will be submitted to the REMC for approval.

ACTION:
PV-OMC Member Bodies to approve the Draft IECRE 04 Edition 2.0 and the PV-OMC scope standards listing no later than 2017-10-23.

NOTE: USNC/IECRE ballots to be submitted one week prior to the IEC deadline.

ARESCA © 2020 All rights reserved