PV-OMC/165/DV: Approval of OD-405-3 ed.2: IECRE Quality System Requirements for PV Module Manufacturers – Part 3: Requirements for PV Factory Auditors (Closes 5-Jul)

starts on 20 June, 2018 ends on 05 July, 2018



Should the US vote to approve OD-405-3 edition 2?

You need to log-in if you want to continue with the voting process
Description

Background:

Operational Document OD-405-3 ed.2 was developed by WG 409. As per PV-OMC/155/DC sent out on 2018-01-22, PV-OMC Member Bodies were requested to provide their comments on Draft OD-405-2 ed.2 by 2018-03-21. Consequently, PV-OMC/161A/CC was published on 2018-06-12.

WG 409 submits a revised Draft OD-405-3 ed.2 based on comments received for PV-OMC approval and immediate implementation.

Action:
The PV-OMC Member Bodies to approve Draft OD-405-3 ed.2, effective immediately. Ballots are to be returned to the IECRE Secretariat ([email protected]) no later than 2018-07-30.

NOTE: USNC/IECRE ballots to be submitted within two weeks to allow for resolution of any comments prior to the IEC deadline.

ARESCA © 2024 All rights reserved