starts on 20 June, 2018 ends on 05 July, 2018
Should the US vote to approve OD-405-3 edition 2?
Background:
Operational Document OD-405-3 ed.2 was developed by WG 409. As per PV-OMC/155/DC sent out on 2018-01-22, PV-OMC Member Bodies were requested to provide their comments on Draft OD-405-2 ed.2 by 2018-03-21. Consequently, PV-OMC/161A/CC was published on 2018-06-12.
WG 409 submits a revised Draft OD-405-3 ed.2 based on comments received for PV-OMC approval and immediate implementation.
Action:
The PV-OMC Member Bodies to approve Draft OD-405-3 ed.2, effective immediately. Ballots are to be returned to the IECRE Secretariat ([email protected]) no later than 2018-07-30.
NOTE: USNC/IECRE ballots to be submitted within two weeks to allow for resolution of any comments prior to the IEC deadline.