PV-OMC/159/DV: Approval of OD-410-3: IECRE Quality System Requirements for PV Plant Installation and Maintenance: Part 3: Requirements for Auditors of PV Service Providers (Closes 4-Apr)

starts on 21 March, 2018 ends on 04 April, 2018



Should the US vote to approve the revised draft of OD-410-3: IECRE Quality System Requirements for PV Plant Installation and Maintenance – Part 3: Requirements for PV Plant Auditors?
You need to log-in if you want to continue with the voting process
Description

Background:
Operational Document OD 410-3 was developed by WG 409. As per PV-OMC/123/DC sent out on 2017-09-29, PV-OMC Member Bodies were requested to provide their comments on Draft OD-410-3 Ed.1.0 by 2017-11-28. Consequently, PV-OMC/141A/CC was published on 2018-01-19.
WG 409 submits a revised Draft OD-410-3 Edition 1 based on comments received for PV-OMC approval and immediate implementation.

Action:
The PV-OMC Member Bodies to approve Draft OD-410-3 Edition 1, effective immediately. Ballots are to be returned to the IECRE Secretariat (secretariat@iecre.org) no later than 2018-04-29.

NOTE: USNC/IECRE ballots to be submitted within two weeks to allow for resolution of any comments prior to the IEC deadline.