PV-OMC/158/DV: Approval of OD-410-1: IECRE Quality System Requirements for PV Plant Installation and Maintenance – Part 1: Requirements for certification (Closes 4-Apr)

starts on 21 March, 2018 ends on 04 April, 2018



Should the US vote to approve the revised draft of OD-410-1: IECRE Quality System Requirements for PV Plant Installation and Maintenance – Part 1: Requirements for certification?

You need to log-in if you want to continue with the voting process
Description

Background:

Operational Document OD 410-1 was developed by WG 409. As per PV-OMC/122/DC sent out on 2017-09-29, PV-OMC Member Bodies were requested to provide their comments on Draft OD-410-1 Ed.1.0 by 2017-11-28. Consequently,
PV-OMC/140A/CC was published on 2018-01-19.

WG 409 submits a revised Draft OD-410-1 Edition 1 based on comments received for PV-OMC approval and immediate implementation.

Action:
The PV-OMC Member Bodies to approve Draft OD-410-1 Edition 1, effective immediately. Ballots are to be returned to the IECRE Secretariat ([email protected]) no later than 2018-04-29.

NOTE: USNC/IECRE ballots to be submitted within two weeks to allow for resolution of any comments prior to the IEC deadline.