starts on 21 March, 2018 ends on 04 April, 2018
Should the US vote to approve the revised draft of OD-410-1: IECRE Quality System Requirements for PV Plant Installation and Maintenance – Part 1: Requirements for certification?
Background:
Operational Document OD 410-1 was developed by WG 409. As per PV-OMC/122/DC sent out on 2017-09-29, PV-OMC Member Bodies were requested to provide their comments on Draft OD-410-1 Ed.1.0 by 2017-11-28. Consequently,
PV-OMC/140A/CC was published on 2018-01-19.
WG 409 submits a revised Draft OD-410-1 Edition 1 based on comments received for PV-OMC approval and immediate implementation.
Action:
The PV-OMC Member Bodies to approve Draft OD-410-1 Edition 1, effective immediately. Ballots are to be returned to the IECRE Secretariat ([email protected]) no later than 2018-04-29.
NOTE: USNC/IECRE ballots to be submitted within two weeks to allow for resolution of any comments prior to the IEC deadline.