8/1546/NP – PNW TS 8-1546: Guidelines for network management – Power Quality Monitoring System (Closes 11-Jul)

starts on 11 June, 2020 ends on 11 July, 2020



Should the US vote to approve the new project?
You need to log-in if you want to continue with the voting process
Description

This Technical Specification intends to provide a guideline for designing a power quality monitoring system for public power supply networks based on the requirements of power quality management. It is applicable for LV, MV, and HV public power supply networks. It will be a bridge between Use Cases and system level requirements from IEC TS 63222 (Guidelines for network management- Power Quality management) and product and/or ICT requirements (e.g in IEC 62749, IEC 62586 or IEC 61850 series).